more G-Labs products

Author Topic: Disable/ pause scheduler event  (Read 743 times)

August 14, 2016, 02:46:03 PM
Read 743 times

Johnny H

  • **
  • Information
  • Jr. Member
  • Posts: 47
If you have various schedules setup, would be nice to be able to pause/disable it in case you need it for a later time. You shouldnt have to delete or remove the  code from the schedule to not make it fire.

August 15, 2016, 08:08:32 PM
Reply #1

bkenobi

  • *****
  • Information
  • Global Moderator
  • Posts: 1525
IIRC, the old scheduled events had a check box next to them.  Is that not available in the updated scheduler?  It was something on the right side in the scheduled events list if memory serves.

August 16, 2016, 03:12:09 AM
Reply #2

Johnny H

  • **
  • Information
  • Jr. Member
  • Posts: 47
Just took another look, no checkbox. There's a little clock, when clicked takes you to the edit page.

August 16, 2016, 05:26:03 PM
Reply #3

bkenobi

  • *****
  • Information
  • Global Moderator
  • Posts: 1525
Then it must have changed.  The attached image is from r519 and the checkbox on the right disables a specific scheduled item.